OUR HISTORY

The original tin stream works at our site

1978

Cornish Concrete Products Ltd, a family owned business, was founded. Started out manufacturing spiral staircases in Ponsanooth near Truro.

Cornish Concrete Products 1978
Cornish Concrete Products Bissoe

1985

Relocated to Bissoe near Truro on a site of a former tin stream works. Added facilities for prestressed T beam flooring.

1989

Introduced hollowcore floor bed and increased production on stairs.

Cornish Concrete Products 1989
Cornish Concrete Products 1995

1995

Production Unit 1 constructed to increase production on T Beams and general concrete products. Variable stair moulds introduced.

2001

Acquired additional land increasing site area to 7.5 Acres.

Cornish Concrete Products 2001
Cornish Concrete Products 2005

2005

Constructed Production Unit 2 to manufacture bespoke concrete products and sandwich panels. First buildings in sandwich panels constructed for Truro College.

2007

Established in house design capability.

Cornish Concrete Products 2007
Cornish Concrete Products 2008

2008

Constructed Production Unit 3 complete with automated carousel plant becoming first UK manufacturer of twin wall products. SWRDA grant awarded in support of new facility in support of innovation for Cornwall.

2010

Two new colleges constructed from sandwich panels.

Cornish Concrete Products 2010
Cornish Concrete Products 2013

2013

Abbey Cresent, Torquay, Devon constructed, £1.7M turnkey envelope solution by Cornish Concrete.

2015

Tekla Structures introduced in house to satisfy BIM Level 2 compliance.

Cornish Concrete Products 2010
Cornish Concrete Products 2016

2016

Further land purchase taking site area to over 9.5 Acres. Production Unit 3 doubled in size to accommodate increase in production of sandwich panel and twin wall products.

2017

Remains a family owned business. Achieved turnover of +61% compared with 2007.

Cornish Concrete Products 2017
Cornish Concrete Products 2016

2019

Awarded Multiple Concrete Society Awards for UCL New Student Centre,
Royal College of Pathology and Hawley Wharf, Camden.

2020

Installation of Solar Array: CleanEarth Energy – 205 roof-mounted panels to provide 75k kilowatt hours of electricity per year, saving 480 tonnes of carbon emissions over the lifetime of the system.

Cornish Concrete Products 2020
Cornish Concrete Products 2021

2021

Achieved turnover of +86% compared with 2011.